TestProject Forum

Does test project allows multiple data sources?

Hi, I am trying to create a data source and arrange them by topic but I am having conflict with the scenarios below:

  1. The test I want to execute requires more than one data source. Does TP allow this or are there any workaround I can do aside from merging all data sources into one?
  2. Is there a way to assign a single data source for all of the tests in a job? or at least have a default data source that can overridden by each test data source?

Thanks

1 Like

Hi,
Currently you need to attach each data source to a test in a job manually.
You cannot attach more than a single data source to a single test, however you can simply include all the parameters in the same data source. incase the parameters do not exist in that test it will ignore them.
That way you can use the same data source for all tests by combining the all the input parameters in a single data source.
Let me know if you managed.

I see. Thank you for the reply

No problem,
Happy to help :slight_smile: